Truck charging site costs and commercial planning
Assess the cost drivers of depot and publicly accessible high-power truck charging.
What determines cost?
Key drivers include grid connection and transformer work, required power, chargers, civil works, grid tariff, network demand fees, energy procurement, site lease, maintenance and operation.
Load profile matters
The ratio between energy delivered and peak power influences effective cost per kilowatt-hour. Utilisation and charging times must be evaluated with realistic operating scenarios.
Storage and smart charging
Load management and batteries may reduce or defer some peak demand or connection upgrades, but can also introduce material costs and constraints.
Explore our expertise
Building a business case for electric HGV charging
Charging demand
Combine planned fleet numbers, daily driving distance, duty cycles and available charging windows to estimate energy and power demand.
Infrastructure economics
Include connection costs, transformer and switchgear, charger installation, civil works, service costs and site-specific grid charges.
Operational resilience
Consider phased rollouts, power allocation between chargers, vehicle arrival peaks and operational contingencies. A precise project calculation needs site data.