Home / Insights and services

Truck charging site costs and commercial planning

Assess the cost drivers of depot and publicly accessible high-power truck charging.

What determines cost?

Key drivers include grid connection and transformer work, required power, chargers, civil works, grid tariff, network demand fees, energy procurement, site lease, maintenance and operation.

Load profile matters

The ratio between energy delivered and peak power influences effective cost per kilowatt-hour. Utilisation and charging times must be evaluated with realistic operating scenarios.

Storage and smart charging

Load management and batteries may reduce or defer some peak demand or connection upgrades, but can also introduce material costs and constraints.

Explore our expertise

Discuss your project ↗

Building a business case for electric HGV charging

Charging demand

Combine planned fleet numbers, daily driving distance, duty cycles and available charging windows to estimate energy and power demand.

Infrastructure economics

Include connection costs, transformer and switchgear, charger installation, civil works, service costs and site-specific grid charges.

Operational resilience

Consider phased rollouts, power allocation between chargers, vehicle arrival peaks and operational contingencies. A precise project calculation needs site data.